{"id":882,"date":"2026-03-24T08:01:22","date_gmt":"2026-03-24T07:01:22","guid":{"rendered":"https:\/\/www.juntspertorrelavit.cat\/?p=882"},"modified":"2026-03-24T08:05:08","modified_gmt":"2026-03-24T07:05:08","slug":"actuacions-en-materia-daigua-legislatures-1999-2019","status":"publish","type":"post","link":"https:\/\/www.juntspertorrelavit.cat\/index.php\/2026\/03\/24\/actuacions-en-materia-daigua-legislatures-1999-2019\/","title":{"rendered":"Actuacions en mat\u00e8ria d&#8217;aigua (Legislatures 1999-2019)"},"content":{"rendered":"\n<p class=\"has-text-align-justify has-text-align-justify\">A tall d\u2019experi\u00e8ncia personal, i sense obviar ni desmer\u00e8ixer la important tasca realitzada en mandats anteriors per garantir el subministrament d\u2019aigua potable al municipi, es detallen tot seguit les principals actuacions que es van dur a terme:<\/p>\n\n\n\n<p><strong>Infraestructures de captaci<\/strong><strong>\u00f3 <\/strong><strong>i emmagatzematge<\/strong><strong><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construcci\u00f3 dels dos dip\u00f2sits actuals del PI, amb una capacitat total de 500.000 litres.<\/li>\n\n\n\n<li>Construcci\u00f3 del pou del PI.<\/li>\n\n\n\n<li>Construcci\u00f3 de pous adjacents a la font de Sant Isidre.<\/li>\n\n\n\n<li>Construcci\u00f3 del nou pou de Mas Vendrell.<\/li>\n\n\n\n<li>Construcci\u00f3 del pou de les Escoles.<\/li>\n\n\n\n<li>Construcci\u00f3 d\u2019un nou pou a Can Rossell de la Serra.<\/li>\n\n\n\n<li>Construcci\u00f3 d\u2019un nou dip\u00f2sit municipal a Can Rossell de la Serra, amb m\u00e9s capacitat i equipat amb bombes d\u2019impulsi\u00f3 mitjan\u00e7ant arrencadors progressius.<\/li>\n\n\n\n<li>Construcci\u00f3 d\u2019un dip\u00f2sit d\u2019acumulaci\u00f3 d\u2019aigua a la pla\u00e7a de la Pau per al reg de manteniment de la jardineria.<\/li>\n<\/ul>\n\n\n\n<p><strong>Xarxa de distribuci<\/strong><strong>\u00f3 <\/strong><strong>i millores estructurals<\/strong><strong><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Construcci\u00f3 de la connexi\u00f3 directa del pou de Sant Isidre amb els dip\u00f2sits del PI.<\/li>\n\n\n\n<li>Construcci\u00f3 d\u2019una xarxa reversible entre el barri del carrer del Bosc i la xarxa d\u2019abastament provinent del PI.<\/li>\n\n\n\n<li>Preparaci\u00f3 de la interconnexi\u00f3 del pou de les Escoles amb la xarxa de subministrament.<\/li>\n\n\n\n<li>Substituci\u00f3 de les canonades de fibrociment d\u2019entrada i sortida del dip\u00f2sit de Mas Vendrell.<\/li>\n\n\n\n<li>Substituci\u00f3 de les canonades del barri de Mussons.<\/li>\n\n\n\n<li>Construcci\u00f3 de la xarxa d\u2019abastament d\u2019aigua des de Font-rub\u00ed fins als barris del Bell Pened\u00e8s i Sant Mart\u00ed Sarroca.<\/li>\n\n\n\n<li>Substituci\u00f3 de canonades durant processos d\u2019urbanitzaci\u00f3 i reurbanitzaci\u00f3 de diversos sectors del municipi.<\/li>\n\n\n\n<li>Sectoritzaci\u00f3 de la xarxa de distribuci\u00f3 en baixa per facilitar la detecci\u00f3 i reparaci\u00f3 de fuites.<\/li>\n\n\n\n<li>Instal\u00b7laci\u00f3 de purgadors a final de l\u00ednia per a l\u2019evacuaci\u00f3 de residus de cal\u00e7.<\/li>\n<\/ul>\n\n\n\n<p><strong>Gesti\u00f3<\/strong><strong>, control i modernitzaci<\/strong><strong>\u00f3 del servei<\/strong><strong><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Redacci\u00f3 del Pla Director de l\u2019Aigua (actualment en revisi\u00f3).<\/li>\n\n\n\n<li>Elaboraci\u00f3 de diversos estudis per a la recerca de noves captacions d\u2019aigua.<\/li>\n\n\n\n<li>Neteja i reperforaci\u00f3 dels pous de Sant Isidre i Mas Vendrell.<\/li>\n\n\n\n<li>Inici de la substituci\u00f3 dels comptadors anal\u00f2gics per comptadors electr\u00f2nics.<\/li>\n\n\n\n<li>Instal\u00b7laci\u00f3 de bombes d\u2019impulsi\u00f3 amb arrencadors progressius.<\/li>\n\n\n\n<li>Instal\u00b7laci\u00f3 de sondes de nivell a tots els pous municipals.<\/li>\n\n\n\n<li>Construcci\u00f3 d\u2019una xarxa telem\u00e0tica mitjan\u00e7ant wifi per a la gesti\u00f3 i coordinaci\u00f3 dels pous de captaci\u00f3 i de la xarxa de distribuci\u00f3, que permetia el control en temps real de la captaci\u00f3, potabilitzaci\u00f3, emmagatzematge i distribuci\u00f3 de l\u2019aigua potable, aix\u00ed com l\u2019emissi\u00f3 d\u2019avisos autom\u00e0tics davant incid\u00e8ncies, incloses les relacionades amb el subministrament el\u00e8ctric.<\/li>\n<\/ul>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"990\" height=\"292\" src=\"https:\/\/www.juntspertorrelavit.cat\/wp-content\/uploads\/2026\/03\/image.png\" alt=\"\" class=\"wp-image-883\" srcset=\"https:\/\/www.juntspertorrelavit.cat\/wp-content\/uploads\/2026\/03\/image.png 990w, https:\/\/www.juntspertorrelavit.cat\/wp-content\/uploads\/2026\/03\/image-300x88.png 300w, https:\/\/www.juntspertorrelavit.cat\/wp-content\/uploads\/2026\/03\/image-768x227.png 768w, https:\/\/www.juntspertorrelavit.cat\/wp-content\/uploads\/2026\/03\/image-615x181.png 615w\" sizes=\"auto, (max-width: 990px) 100vw, 990px\" \/><\/figure>\n\n\n\n<p><strong>Planificaci<\/strong><strong>\u00f3 supramunicipal<\/strong><strong><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Adhesi\u00f3 a la proposta de l\u2019Ag\u00e8ncia Catalana de l\u2019Aigua (ACA) per a la redacci\u00f3 del projecte executiu de la portada d\u2019aig\u00fces d\u2019ATLL, des de la canonada de la carretera Sant Sadurn\u00ed\u2013Vilafranca fins a Sant Quint\u00ed de Mediona, passant per Torrelavit, amb la construcci\u00f3 d\u2019un dip\u00f2sit d\u20191 mili\u00f3 de litres al paratge de la Creu. Projecte que va quedar aturat arran de la fallida de l\u2019ACA.<\/li>\n<\/ul>\n\n\n\n<p><strong>Normativa, suport municipal i sensibilitzaci<\/strong><strong>\u00f3<\/strong><strong><\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Modificaci\u00f3 de la normativa municipal per incorporar l\u2019obligatorietat de dip\u00f2sits d\u2019aigua amb bombes d\u2019impulsi\u00f3 en les noves construccions d\u2019habitatges plurifamiliars.<\/li>\n\n\n\n<li>Proposta de finan\u00e7ament municipal per a edificis plurifamiliars que no disposaven de dip\u00f2sits d\u2019acumulaci\u00f3 d\u2019aigua de la xarxa.<\/li>\n\n\n\n<li>Campanyes de sensibilitzaci\u00f3 per a l\u2019estalvi d\u2019aigua.<\/li>\n\n\n\n<li>Construcci\u00f3 del Centre d\u2019Interpretaci\u00f3 de l\u2019Aigua, amb la finalitat, entre d\u2019altres, de posar en valor aquest b\u00e9 esc\u00e0s.<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>A tall d\u2019experi\u00e8ncia personal, i sense obviar ni desmer\u00e8ixer la important tasca realitzada en mandats anteriors per garantir el subministrament d\u2019aigua potable al municipi, es detallen tot seguit les principals actuacions que es van dur a terme: Infraestructures de captaci\u00f3 i emmagatzematge Xarxa de distribuci\u00f3 i millores estructurals Gesti\u00f3, control &hellip;<\/p>\n","protected":false},"author":1,"featured_media":887,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"spay_email":"","footnotes":""},"categories":[5],"tags":[],"class_list":["post-882","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-noticies"],"jetpack_featured_media_url":"https:\/\/www.juntspertorrelavit.cat\/wp-content\/uploads\/2026\/03\/Sin-titulo-2.jpg","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/www.juntspertorrelavit.cat\/index.php\/wp-json\/wp\/v2\/posts\/882","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.juntspertorrelavit.cat\/index.php\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.juntspertorrelavit.cat\/index.php\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.juntspertorrelavit.cat\/index.php\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.juntspertorrelavit.cat\/index.php\/wp-json\/wp\/v2\/comments?post=882"}],"version-history":[{"count":2,"href":"https:\/\/www.juntspertorrelavit.cat\/index.php\/wp-json\/wp\/v2\/posts\/882\/revisions"}],"predecessor-version":[{"id":888,"href":"https:\/\/www.juntspertorrelavit.cat\/index.php\/wp-json\/wp\/v2\/posts\/882\/revisions\/888"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.juntspertorrelavit.cat\/index.php\/wp-json\/wp\/v2\/media\/887"}],"wp:attachment":[{"href":"https:\/\/www.juntspertorrelavit.cat\/index.php\/wp-json\/wp\/v2\/media?parent=882"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.juntspertorrelavit.cat\/index.php\/wp-json\/wp\/v2\/categories?post=882"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.juntspertorrelavit.cat\/index.php\/wp-json\/wp\/v2\/tags?post=882"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}